• Slide Image 1 Title | Welcome to D5 Smartia Theme, Visit D5 Creation for Details

    You can use D5 Smartia for Black and White looking Smart Blogging, Personal or Corporate Websites. This is a Sample Description and you can change these from Samrtia Options
  • Slide Image 2 Title | Welcome to D5 Smartia Theme, Visit D5 Creation for Details

    You can use D5 Smartia for Black and White looking Smart Blogging, Personal or Corporate Websites. This is a Sample Description and you can change these from Samrtia Options
  • Slide Image 3 Title | Welcome to D5 Smartia Theme, Visit D5 Creation for Details

    You can use D5 Smartia for Black and White looking Smart Blogging, Personal or Corporate Websites. This is a Sample Description and you can change these from Samrtia Options

Xining urban planning and Construction Bureau deputy director Wang Senlin interview with reporters

Posted by: | Posted on: April 2, 2017

west Metropolis Daily reported that part of the Road West brick loose loose after the phenomenon, causing the reader’s strong concern, have to call the newspaper 96369 news hotline, published views. In this regard, the reporter summed up some of the questions raised by the reader, interviewed the deputy director of the Xining urban and rural planning and Construction Bureau Wang Lin. Wang Senlin, deputy director, said in an interview, thanks to the media supervision and public concern, he said, people have more right to know.

reporter: in recent days, the newspaper news hotline received a phone call to reflect the phenomenon of broken brick road west, the reporter confirmed the situation after the interview with the reader to reflect the true situation. Subsequently, there are a number of people called to ask whether the road brick damage caused by quality problems. Excuse me, West Street roadway laying brick produced in which manufacturers, the quality is qualified, after the test of the relevant departments?

Wang Senlin:

is the full name of the sintering ceramic brick pavers, it can not only laying sidewalks, and can be used in the driveway. Shaanxi Province, Fuping road brick art building materials limited liability company production, specifications for 230× 115× 50 (mm), after the detection of national building materials industry of wall and roof materials quality supervision and testing center, the compressive strength and wear coefficient reached the related standard. Manufacturers have written test report, the construction unit has also been reviewed. Therefore, the ceramic tiles are qualified, there is no quality problems.

reporter: West Street Road rehabilitation project is an important project in the construction of Xining City, which is in charge of the construction units, supervision units have, then choose the construction unit after the procedures?

Wang Senlin: after this project is determined, we strictly in accordance with the relevant procedures, the construction unit of the tender. According to the relevant conditions of the other side, the Xining Municipal Engineering Management Office to determine the construction unit of Shantou Nanhua Construction Co., ltd.. In charge of this project, the project supervision unit is Qinghai province state macro engineering consulting supervision co..

reporter: West Street project is completed, if completed, which is the acceptance unit?

Wang Senlin: at present, the west street sidewalk is still under construction, not completed, the inspection work to be completed until after the completion of the sidewalk. In this project, we as soon as possible in order to open the road, convenient public travel, try to rush deadlines, resulting in traffic pavement problems. In this regard, we extend our sincere apologies to all the people, and will find ways to use the shortest possible time and maximum effort to properly resolve the matter as soon as possible.

reporter: members of the public to reflect on the hotline, the construction team seems to employ temporary staff. I would like to ask, is responsible for the construction of the project team is qualified, whether the project subcontracting phenomenon? Wang Senlin: to determine the construction unit for the South China Construction Co., Ltd. Shantou, after a rigorous tender procedures, qualification is not a problem. For the public, the construction team seems to employ temporary staff;





Leave a Reply

Your email address will not be published. Required fields are marked *