• Slide Image 1 Title | Welcome to D5 Smartia Theme, Visit D5 Creation for Details

    You can use D5 Smartia for Black and White looking Smart Blogging, Personal or Corporate Websites. This is a Sample Description and you can change these from Samrtia Options
  • Slide Image 2 Title | Welcome to D5 Smartia Theme, Visit D5 Creation for Details

    You can use D5 Smartia for Black and White looking Smart Blogging, Personal or Corporate Websites. This is a Sample Description and you can change these from Samrtia Options
  • Slide Image 3 Title | Welcome to D5 Smartia Theme, Visit D5 Creation for Details

    You can use D5 Smartia for Black and White looking Smart Blogging, Personal or Corporate Websites. This is a Sample Description and you can change these from Samrtia Options

Xining key water conservancy project Nanchuan river water into the city to achieve the target

Posted by: | Posted on: March 19, 2017

In September 29th, Xining municipal Party committee and the municipal government project of key water conservancy, Nanchuan river city core section of water into the city water engineering trial success. Nanchuan river marks the water into the city to achieve the objectives, to improve the ecological environment of Nanchuan river river city, improve the quality of the city, improve the living environment and investment environment level has very important significance.

the project since mid August started construction since the city water department and the construction units in close cooperation, work together to overcome the day and night construction, short construction period, heavy task, difficult coordination difficulties, to ensure the smooth progress of construction. The project from Nanchuan reservoir in Huangzhong County of tail water of water, and in the 54 bridge to the estuary into the maintenance of the original stack drainage experiment 2 River Island, the original river muddy water is diverted to the drainage culvert on both sides, water from the aqueduct at the step by step into the liberation of cascade water, the main trunk project completed in September 20th through September 29th, a successful test.  





Leave a Reply

Your email address will not be published. Required fields are marked *